TSX-V: VO Last: 0.07 Change: 0.00 | OTCQB: KVLQF Last: 0.05 Change: 0.00
TSX-V: VO     Last: 0.07     Change: 0.00
OTCQB: KVLQF     Last: 0.05     Change: 0.00
~80%
of primary PGE supply comes from Southern Africa and Russia *
4th
consecutive year of platinum market deficit forecast for 2026 †
US + EU
have both designated platinum a critical mineral ‡
<3 months
of above-ground platinum stock cover anticipated by end of 2026 †

Five forces, pulling in one direction

Concentrated supply, underestimated demand and an emerging policy response are converging on a single conclusion: the West needs new, secure sources of platinum group elements.

01 Concentrated, fragile supply

Roughly four out of every five ounces of newly mined PGE supply come from just two regions, Southern Africa and Russia. Both face structural headwinds: ageing mines, rising costs, power instability and, in Russia’s case, the added overlay of sanctions and geopolitical risk. No major new source has emerged to close the gap, and meaningful new supply takes years of exploration, permitting and construction to bring online. For a metal group this essential, that concentration is not a footnote. It is the central risk.

02 Demand the market underestimates

The demand story runs well beyond catalytic converters, and several of its largest drivers are still early in their growth.

MOBILITY

Hybrid Vehicles

Hybrids are the fastest-growing segment of the global car market and they carry increased PGE loadings rather than removing them. As hybrids take share from both conventional and battery-electric vehicles, they sustain catalytic (thus, PGE) demand for years.

INVESTMENT

Chinese demand

Chinese appetite is broadening from jewelry into investment, with bars, coins and exchange products drawing new buyers while platinum trades at a persistent discount to gold.

ENERGY

The hydrogen economy

Fuel cells and electrolyzers are a long-dated but scaling source of platinum demand, and a renewed focus on energy security is reinvigorating interest in hydrogen as a strategic technology.

03 A deficit the market is only beginning to price

Platinum has been in structural deficit for several years, and 2026 is forecast to mark a fourth consecutive annual shortfall. Mine supply has stayed broadly flat even as prices have re-rated sharply, because higher prices cannot quickly conjure new mines. Above- ground stocks have absorbed the difference, and that cushion is thinning toward under three months of demand cover. The result is a market with little margin for further disruption, and a price signal that increasingly reflects scarcity rather than momentum.

04 From market risk to strategic priority

Supply concentration has moved from a market concern to a policy one. Platinum sits on the United States critical minerals list, and the European Union’s Critical Raw Materials Act has made securing platinum group metals a strategic priority. Industrial policy, security of supply and sovereign demand are now pulling in the same direction: diversifying PGE supply away from concentrated and contested jurisdictions. That is the layer that turns a well-located mining project into a strategic asset.

05 Where ValOre fits: A near-surface PGE district in a stable mining jurisdiction

Brazil is a stable, mining-friendly jurisdiction with established infrastructure and a clear permitting path. Pedra Branca is a district-scale, near-surface PGE system, and proprietary bioleaching research is targeting the processing economics that have historically held back weathered PGE ores elsewhere.

The macro case is strong enough to stand on its own. ValOre’s role is to be credibly and visibly positioned within it, with a defined path from resource toward a Preliminary Economic Assessment.

See how Pedra Branca is positioned within this market

See the Pedra Branca Project

Corporate Presentation

* Industry estimates of combined primary platinum group element production. “Southern Africa” includes South Africa and Zimbabwe. 

† World Platinum Investment Council, Platinum Quarterly Q1 2026 (May 2026). Above-ground stock cover refers to year-end forecast stock relative to annual demand. 

‡ United States Geological Survey 2022 List of Critical Minerals (platinum group elements); European Union Critical Raw Materials Act (platinum group metals listed as critical and strategic raw materials).

This page contains forward-looking information within the meaning of applicable Canadian securities laws, including statements regarding commodity markets, supply and demand outlooks and anticipated project milestones. Such statements are based on current expectations and are subject to risks and uncertainties. Market and pricing data are sourced from third parties and are provided for context only. Read the full forward-looking statements and cautionary notes.

Corporate Presentation

Corporate Presentation
Last Updated: June 2026

Be First to the Next Catalyst

ValOre Metals Corp. (TSX-V: VO) is a Brazilian PGE developer advancing the 100%-owned Pedra Branca platinum, palladium and gold project in Ceará State, Brazil, with a 2.2-million-ounce NI 43-101 inferred resource. A member of Discovery Group, ValOre is building toward an integrated precious metals producer anchored by Pedra Branca and an active acquisition pipeline.